Source Notes
Chapter 10: Saturn I Launches (1962-1965)
- 1. LOD, "SA-2 Daily Status Reports,"
Robert Moser papers, Federal Archives and Records Center, East
Point, GA, accession 68A1230, boxes 436257, 436259.
- 2. MSFC, Results of the Second
Saturn Launch Vehicle Test Flight SA-2, report MPR-SAT-63-13
(Huntsville, AL, 16 Oct. 1963), pp. 1-5, 24, 49; Speer, Saturn
I Flight Test Evaluation, pp. 1-6.
- 3. ARINC Research Corp.,
Reliability Study of Saturn SA-3 Pre-Launch Operations, by
Arthur W. Green et
al. (Washington, 3 Jan. 1963), pp. 4-7 through 4-11, 7-1.
- 4. MSFC, Results of the Third
Saturn I Launch Vehicle Test Flight, SA-3, report MPRSAT-64-l3
(Huntsville,
AL, 26 Feb. 1964), pp. 1-8; Speer, "Saturn I Flight Test
Evaluation," p. 2; DDJ, 1 Nov. 1962.
- 5. MSFC, Results of the Fourth
Saturn I Launch Vehicle Test Flight, SA-4, report MPRSAT-63-6
(Huntsville, AL, 10 May 1963), pp. 5-7; Spaceport News, 9
Apr. 1964, p. 3; Chambers interview.
- 6. MSFC, Results of SA-4, pp.
1-7, 16-17; Speer, "Saturn I Flight Test Evaluation," p. 2.
- 7. MSFC, Results of the Saturn I
Launch Vehicle Test Flights, report MPR-SAT-FE-66-9
(Huntsville, AL, 9
Dec. 1966), pp. 26-27.
- 8. MSFC, Results of SA-3, pp.
7-8; MSFC, Results of SA-4, p. 7; House Committee on Science
and
Astronautics, Subcommittee on Manned Space Flight, Hearings:
1964 NASA Authorization, 88th Cong., 1st
sess., 6 Mar. 1963, pt. 2(a), p. 198; MSFC, Saturn Monthly
Progress Reports (Jan.-Aug. 1962).
- 9. Debus to Rees, "Additional Saturn
Launch Complex," 29 Jan. 1960.
- 10. Capt. Arthur G. Porcher, Chief,
Facilities Br., Army Test Off., AFMTC, "Additional Launch
Facilities
for Saturn Type Vehicle," 5 Feb. 1960; Col. Donald Heaton to Gen.
Ostrander, "Price Increase in Second
Saturn Launch Complex," 12 Feb. 1960.
- 11. Philip Claybourne, Saturn Project
Off., to MFL Br. Chiefs, "Back-Up of Saturn Launch Facilities," 10
May 1960.
- 12. Harvey F. Pierce to Debus, 26
Feb. 1960.
- 13. Debus to Zeiler, "Formation of
Committee to Review Service Structure Design," 9 Mar. 1960; DDJ,
11,
13 Apr. 1960.
- 14. Debus, memo for record, "Drift
of the Saturn C-2 Vehicle at Launching," 12 July 1960; MSFC,
"Summary Report and Recommendations of Saturn Service Structure No.
II Design Committee," by Harvey
F. Pierce, 12 July 1960, pp. 4-18.
- 15. MSFC, "Summary Report of Saturn
Service Structure Committee," pp. 4-18.
- 16. Ibid.; LOC, "Concept Development
of Saturn Service Structure, No. II," by James Deese, Apr. 1963,
pp.
26-27, James Deese papers.
- 17. DDJ, 29 Aug. 1960:
- 18. Debus to von Braun, "Hazard Study
of Liquid Hydrogen, LO2 and RP-1," 10 Jan. 1961; DDJ, 9, 11, 13
Jan. 1961.
- 19. DDJ, 13 Jan. 1961.
- 20. LFSEO Monthly Progress Report,
12 June 1961, p. 1; Poppel to Parker, "Criteria for VLF 37," 22
Dec.
1960; J. W. Ault, memo for record, "Contract for LC-37 Design," 23
Feb. 1961; Dodd to Corps of
Engineers, "Vibroflotation for Complex 37A," 18 Oct. 1961, Debus
papers.
- 21. MSFC, Saturn Quarterly
Progress Report (July-Sept. 1961), report MPR-SAT-61-11, 1 Dec.
1961, p.
94; MSFC, Saturn Quarterly Progress Report (Jan.-Mar. 1962),
MPR-SAT-62-3, p. 36; Michael Getler,
"Complex 37 Will Dwarf Predecessors," Missiles and Rockets,
18 Dec. 1961, pp. 24-25, 47.
- 22. Getler, "Complex 37," pp.24-25,
47; "The Biggest Thing on Wheels in the World," prepared by Batten,
Barton, Durstine, and Osborne, Inc., Pittsburgh, for U.S. Steel,
Jan. 1963.
- 23. D. E. Eppert, Chief, Construction
Div., Canaveral Dist., Corps of Engineers, to James J. Frangie,
"List
of Saturn Construction Contracts," 12 Sept. 1968, p. 16; NASA
Fifth Semi-Annual Report to Congress, 1
Oct. 1960 through 30 June 1961, p. 145; Emil Bertram, memo for
record, "Apollo-Saturn Subpanel
Activities," 15 July 1963, p. 3.
- 24. MSFC, Results of Saturn I
Launch Vehicle Tests, pp. 3-5.
- 25. "Daily Status Reports, LC-37B Wet
Test Vehicle," Robert Moser papers; Moser interview, 18 July 1973;
Akens, Saturn Illustrated Chronology, pp. 58-61.
- 26. Gruene to Debus, 12 Sept.
1963.
- 27. D. L. Childs to LVO, S-IV-5
Status Reports #23, 29 Aug., and #33, 11 Sept. 1963; S-IV-5 Daily
Log, 21-
22 Sept. 1963, Robert Moser papers; LVO, "SA-5 Daily Status
Report," 23, 24, 25 Sept. 1953.
- 28. "SA-5 Daily Status Reports," 11,
14, 17 Oct. 1963; Gruene to Debus, 17 Oct. 1963.
- 29. LVO, "SA-5 Daily Status Reports,"
11 Oct. 1963.
- 30. Ibid., 22 Oct., 7 Nov. 1963;
Gruene to Debus, 31 Oct. 1963; Fannin interview.
- 31. LVO, "SA-5 Daily Status Reports,"
27 Nov. 1963; Corn interview, 23 July 1973; Zeiler interview, 23
July 1973; Pickett interview.
- 32. LVO, "SA-5 Daily Status Report,"
27 Nov., 6, 8, 10, 13 Dec. 1963.
- 33. Ibid., 23, 27 Dec. 1963, 14, 17,
19 Jan. 1964.
- 34. Akens, Saturn Illustrated
Chronology, pp. 72-73; Cocoa Tribune, 29 Jan. 1964.
- 35. MSFC, Results of the Fifth
Saturn I Launch Vehicle Test Flight, SA-5, report
MPR-SAT-FE-64-17 (Huntsville, AL, 22 Sept. 1964), pp. 5-7; Cocoa
Tribune, 28, 29 Jan. 1964.
- 36. KSC, "Presentation to the
Subcommittee on Manned Space Flight of the House Committee on
Science
and Astronautics at KSC," 27 Jan. 1964; Sherrer interview.
- 37. Cocoa Tribune, 28 Jan.
1964, p. 2.
- 38. KSC, "Presentation to the
Subcommittee," 27 Jan. 1964.
- 39. R. P . Eichelberger, "The Saturn
Telemetry System," pp. 1-3; KSC, "Technical Progress Report," 24
Jan.
1964; Spaceport News, 23 Jan. 1964, p. 2; "Consolidated
Instrumentation Plan," pt. IIA of Firing Test
Report, Saturn I SA-5, 22 Jan. 1964 (TR-4-36), pp. 6, 19,
31.
- 40. Spaceport News, 4 June
1964, p. 1; NASA release 63-268, 23 Jan. 1964; New York
Times, 27 Jan. 1964;
Speer, "Saturn I Flight Test Evaluation," pp. l-8.
- 41. Orlando Sentinel, 30 Jan.
1964, pp.1, 42.
- 42. James Grimwood, JSC Historian,
supplied information for this section.
- 43. Spaceport News, 4 June
1964, p. 2; NASA, Astronautics and Aeronautics, 1964, pp.
70, 126; Sasseen
interview, 26 July 1973.
- 44. Orlando Sentinel, 21 May
1964; Melbourne Daily Times, 26, 27 May 1964.
- 45. Spaceport News, 4 June
1964, p. 5; MSFC, Results of the Saturn I Launch Vehicle Test
Flights, p. 23.
- 46. Spaceport News, 13 Aug.
1964, p. 3; Davidson interview.
- 47. Cocoa Tribune, 20 July
1964; Spaceport News, 23 July 1964, p. 2; Newall
interview.
- 48. Cocoa Tribune, 28 Aug.
1964; Orlando Sentinel Star, 8, 9 Sept. 1964; Miami
Herald, 16 Sept. 1964;
Spaceport News, 27 Aug., 3, 10, 17 Sept. 1964; Aviation Week
and Space Technology, 28 Sept. 1964, p. 27.
- 49. Gen. Samuel Phillips to George
Mueller, 14 Jan. 1965; Mueller to Debus, 10 Feb. 1965; weekly notes
from Petrone to Debus, 4 Feb. 1965.
- 50. MSFC, Results of the Eighth
Saturn I Launch Vehicle Test Flight, SA-9, report
MPR-SAT-FE-65-6
(Huntsville, AL, 30 Apr. 1965), p. 14; Akens, Saturn Illustrated
Chronology, p. 104.
- 51. Ibid., pp. 9-14; "Pegasus
Returning Meteoroid Flux Data," Aviation Week and Space
Technology, 22
Feb. 1965, p. 28.
- 52. MSFC, Results of the Ninth
Saturn I Launch Vehicle Test Flight, SA-8, report MPR-SAT-FE-11
(Huntsville, AL, 27 July 1965), pp. 7-15; "First Industry-Built
Saturn I Puts Pegasus-2 in Precise Orbit,"
Aviation Week and Space Technology, 31 May 1965, p. 21.
- 53. MSFC, Results of the Tenth
Saturn Launch Vehicle Test Flight, SA-10, report
MPR-SAT-FE-65-14
(Huntsville, AL, 24 Sept. 1965), p. 8.