Source Notes
Chapter 13: New Devices for New Deeds
- 1. D. D. Buchanan, memo for the
record, 16 April 1962.
- 2. LOC, Procurement Plan,
signed by Kurt Debus, Director, 11 Sept. 1962, p. 2.
- 3. DDJ, 1, 7 Nov. 1962; Debus to
Brackett, 29 Nov. 1962; LOD, "Crawler/Transporter Proposal
Conference Attendees, 17 December 1962" (in Buchanan file).
- 4. R. P. Young, Exec. Off., memo for
record, 13 Mar. 1963, in NASA History Office; James E. Webb and
Robert C. Seamans, Jr., "Statement of the NASA Administrator on
Selection of a Contractor for the Crawler-Transporter," 13 May
1963, ibid.; Congress and the Nation, 1945-1964 (Washington:
Congressional Quarterly Service, 1965), p. 320.
- 5. "Briefing, Crawler-Transporter
Procurement," 5 Feb. 1963, copy in Fred Renaud's private papers.
- 6. "Decision to Negotiate an
Individual Contract under 10 USC 2394 (a) (11)," 5 Dec. 1963;
"Determination and Findings for Method of Contracting,
Cost-Plus-Incentive Fee... 7 Dec. 1962, both in NASA History Off.
- 7. W. Kraft, Admin. Asst., Marion
Power Shovel Go., to Theodor A. Poppel, 11 Dec. 1963, pp. 1-4, in
Fred Renaud's private papers.
- 8. Ibid., pp. 5-6.
- 9. Renaud interview, 4 Apr. 1973.
- 10. Aviation Week 84 (20 June
1966): 78.
- 11. Gramer interview, 19 July 1973.
- 12. "Fire Alarm System for
Crawler-Transporter," 29 Jan. 1965, in Fred Renaud's private
papers.
- 13. Gorman to Petrone, 22 Mar. 1965,
including a memo of 29 Feb. (sic) 1965, in Fred Renaud's private
papers.
- 14. "Fire Protection Survey and
Recommendations," attachment to letter of C. W. Conway to Ronald
Worchester, 16 June 1965; copies in Fred Renaud's private papers.
- 15. Spaceport News, 15 Feb.
1968, p. 6.
- 16. Unless otherwise cited, the
descriptive information in this and the following paragraphs
concerning the crawlerway and launch pad A facilities is based on
the LC-39 Facilities Handbook, pp. 35-51.
- 17. Spaceport News, 19 Sept.
1963, p. 1; 17 Oct. 1963, p. 1; Tabulation of Corps of Engineers
Contracts, Sept. 1968; "Summary Project Status Report," 29 Nov.
1963, pp. III-2. IV-3; Technical Progress Report, Second Quarter
CY 1965 (TR-194), 30 July 1965, p. 38.
- 18. Apollo/Saturn V MILA
Facilities Descriptions, report K-V-011, p. 1-26.
- 19. Memo, Col. Bagnulo, 3 Feb. 1965.
- 20. Hahn interview.
- 21. Boylston interview.
- 22. Wm. Clearman, Prototype of
Service Arm 6, 30 July 1963, on microfilm in Vehicle Servicing and
Accessories Sec. of Design Engineering Off., KSC.
- 23. "Qualification Test for Cable
Retract Sled for Saturn V and Pneumatic Console No. 2," prepared
by C. Dyer, Brown Engineering, in Design Engineering Files;
photographs in Brad Downs's Design Engineering Files, KSC. The
authors are indebted to Mr. Downs for his help in this section.
- 24. "Weekly Notes," Haworth, 5 Aug.;
Clark, 6 Aug. 1964; Gramer interview, 19 Sept. 1972.
- 25. "Weekly Notes," 19 Aug. 1964.
- 26. Technical Progress Report
Third and Fourth Quarter CY 1964 (TR-159), 5 Mar. 1965, p. 61;
"Saturn V Swing Arm Program Problem," an analytical statement,
unsigned and undated. This contract was NAS 10-1751.
- 27. Rowland interview; R. D. Rowland,
Hayes International Corp., to Benson, 25 July 1972.
- 28. James W. Dalton and Willard
Halcomb, Apollo-Saturn V Test and Systems Engineering Off., to
Petrone, 28 Oct. 1964; "Saturn V Swing Arm Program Problem," p. 1.
- 29. William L. Clearman, Jr., Chief,
Apollo-Saturn V Test and Systems Engineering Off., to Chief, Launch
Equipment Support Sec., Procurement Div., "Contract NAS10-1751,
Proposed Changes to Incorporate Revised Drawing Lists," 23 Nov.
1966.
- 30. James W. Dalton, Apollo-Saturn
V Test and Systems Engineering Off., "Minutes of Meeting - Change
Review Board - Service Army Contract with International - 17 Sept.
1964," 22 Sept. 1964; Method of Handling Engineering Changes,
Contracts NAS10-1751-NAS10-1847.
- 31. James W. Dalton to William T.
Clearman, "Status of Hayes Service Arm Contract as Result of Sole
Source Vendor Items," 2 Dec. 1964.
- 32. "Saturn V Swing Arm Program
Problem," p. 2.
- 33. Kurt H. Debus to L. F. Jeffers,
Hayes International Corp., Birmingham, AL, 5 Nov. 1965.
- 34. "Saturn V Swing Arm Program
Problem," p. 1 ; "Management Inquiry into the Procurement of
Service Arms for Launch Complex 39," pp. 42, 43, 62.
- 35. "Saturn V Swing Arm Program
Problem," p. 1; Gramer interview, 21 Sept. 1972.
- 36. Spaceport News, 28 Oct.
1965, p. 3.
- 37. Technical Progress Report
Third and Fourth Quarter CY 1964 (TR-159), 5 Mar. 1965, p. 61;
Procurement Div., "Status Summary of Active Contracts as of 31 Mar.
1964," sec. II, p. 25.
- 38. Technical Progress Report
Third Quarter CY 1965 (TR-250), 30 Sept. 1965, pp. 3-18.
- 39. Saturn V Launch Support
Equipment General Criteria and Description (SP-4-37-D), rev.
15 Sept. 1964, Launch Support Equipment Engineering Div., pp.
2-62; Technical Progress Report First Quarter CY 1965, 26
Apr. 1965, p. 46; KSC Procurement Div., "Status Summary of Active
Contracts as of 30 Sept. 1966," sec. II, p. 6.
- 40. "Apollo Saturn V MILA Facilities
Descriptions," pp.2-81, 2-82; "Construction Progress Reports," 1
July 1965, p. 4.
- 41. R. T. Cruden and J. R. Ellis,
memo for record, "Ordnance Meeting, LC-39 Arming Tower," 25 Mar.
1963; J. R. Ellis, memo for record, "Ordnance Requirements, Arming
Tower LC-39," 26 Mar. 1963; W. T. Clearman, Jr., and James H.
Deese, "Meeting at Complex 34 Operations Support Building to
Discuss Saturn-V Ordnance Installation Problem," 27 Mar. 1963. The
authors are indebted to Francis Jarrett for research on this
subject, which is covered more fully in Jarrett and Lindemann,
"History of the John F. Kennedy Space Center, NASA, to 1965,"
typescript.
- 42. J. R. Ellis, memo for record,
"Meeting and Discussions Concerning Arming Tower, LC-39," 9 Apr.
1963; minutes of meeting, "Rust Contract BE-9002, LC-39 Arming
Tower, Contract DA-08-123-ENG-(NASA-1752)," 15 Apr. 1963.
- 43. Off. of the Canaveral Dist.
Engineer, "Report on Restudy of Arming Tower to Resolve Dead Load
and Wind Load Problems," 20 Dec. 1963, pp. 1-5.
- 44. Ibid.
- 45. Vehicle Design Integration
Working Group, "Minutes of the Saturn V Common Ordnance Meeting,"
Huntsville, AL, 10-11 Dec. 1963, pp. 1-4.
- 46. "Summary Project Status Report,"
17 Apr. 1964, p. lV-3; "Development Summary Schedule, Complex 39,
1963"; Technical Progress Report, Third and Fourth Quarter CY
1964, 5 Mar. 1965, pp. 45, 58; Tabulation of Corps of Engineers
Contracts, Sept. 1968; Technical Progress Report, Second Quarter
CY 1965, 30 July 1965, p. 38; Technical Progress Report, Third
Quarter CY 1965 (TR-250), 30 Sept. 1965, pp. 3-18; LC-39
Facilities Handbook, p. 54.
- 47. Technical Progress Report,
Third and Fourth Quarter CY 1964 (TR-159), 5 Mar. 1965. p. 45.
- 48. Technical Progress Report,
First Quarter CY 1965 (TR-168), 26 Apr. 1965, p.33:
Technical Progress Report, Second Quarter CY 1965 (TR-194),
30 July 1965, p. 34.
- 49. H. D. Brewster and E. G. Hughes,
Lightning Protection for Saturn Launch Complex 39, report
TR-4-28-2-D, 18 Oct. 1963.
- 50. Ibid., app. A.
- 51. Ibid., pp. 3-6 through 3-16 and
app. A.
- 52. Ibid., pp. 2-3, 3-3, 3-4, A-1;
A. R. Raffaelli, "Introduction to Lightning," report LOC
LT1R-2-DE-62-6, 14 Dec. 1962.
- 53. H. D. Brewster to Lightning
Protection Committee, "Minutes of the Third Lightning Protection
Committee Meeting, 29 Sept. 1965, at KSC," 20 Oct. 1965, KSC
Technical Documents Library.
- 54. KSC, "Weather Effects on
Apollo/Saturn V Operations, Apollo 4 through Apollo 13," report
630-44-001, 27 July 1970.
- 55. KSC release 11-66, 21 Jan. 1966.
- 56. Building Construction
Magazine, Feb. 1966, p. 29.