Source Notes
Chapter 6: LC-39 Plans Take Shape
- 1. Logsdon, "NASA's Implementation," p. 22; Ivan D. Ertel and
Mary Louise Morse, The Apollo Spacecraft, A Chronology, vol. 1 (NASA SP-4009, 1969), pp.
95, 108-109.
- 2. Logsdon, "NASA's Implementation," p. 34.
- 3. Ibid., pp. 40-44; Shea interview; Rosen interview, 14 Nov.
1969; Ertel and Morse, Apollo Chronology, 1:118-20, 134.
- 4. Ertel and Morse, Apollo Chronology, 1: 131-34; Akens,
Saturn Chronology, pp. 33-35.
- 5. James Grimwood and Barton Hacker, with Peter
Vorzimmer, Project Gemini, A Chronology (NASA SP-4002, 1969), pp. 2-20.
- 6. Ertel and Morse, Apollo Chronology, 1: 111.
- 7. Ibid., p. 101.
- 8. Ibid., pp. 101-104, 121, 128; NASA release 66-15, "Apollo
Spacecraft Contract," 21 Jan. 1966.
- 9. Martin Marietta Corp., Saturn C-3 Launch Facilities Study
Final Report, vol. 1, Selection of Optimum Concept, report ER 12125-1 (Baltimore, Dec.
1969), p. 1.
- 10. Ibid., pp. vii, 1-1 1, 70-85; Martin Co., Special Study
Saturn Launch Facilities, report ER 11996 (Baltimore, 17 Oct. 1961), pp. II-1 through II-5;
calendar and schedule of events in O. K. Duren's private papers.
- 11. LFSEO, LOD, A Preliminary Study of Launch Facility
Requirements for the C-4 (Huntsville, AL, 27 Oct. 1961), p. 38.
- 12. George von Tiesenhausen, memo for record, "Launch
Complex 39," 11 Oct. 1951.
- 13. Harvey F. Pierce, Maurice H. Connell & Assoc., Inc.,
to Debus, 21 Nov. 1961, Debus papers.
- 14. Poppel to Petrone, memo, "Saturn C-3/C-4 Study," 9 Oct.
1961.
- 15. Biographies, KSC Archives; Owens interview, 21 Nov.
1972.
- 16. MSFC, Saturn Mobile (Canal) Concept Flame Deflector
and Launcher/Transporter Emplacement Evaluation, by George Waiter, report
MIN-LOD-DH-2-62 (Huntsville, AL, Feb. 1962).
- 17. Poppel to E. House, "Temporary Employment of Naval
Architecture Consultant," 22 Dec. 1961; "LFSEO Monthly Progress Report," 15 Feb. 1962, p. 8.
- 18. Martin, Saturn C-3 Study, vol. 3, Design Criteria
for Launch Facilities, report ER 12125-3, Dec. 1961, pp. 57-84.
- 19. "LFSEO Monthly Progress Report," 15 Feb. 1962, p. 8.
- 20. Debus to Petrone, "Transportation Proposals for Complex
39," 30 Jan. 1962; DDJ, 30 Jan. 1962.
- 21. Duren interview, 29 Mar. 1972; Zeiler interview, 24 Mar.
1972; private papers of Duren.
- 22. "LOD Weekly Notes," Petrone, 8 Feb. 1962; W. T. Clearman,
Acting Sec., Heavy Vehicle Systems Off., memo for record, "Complex 39 Staff Meeting," 12 Mar.
1962, Petrone papers.
- 23. MSFC, Appraisal of Transfer Modes for Saturn C-5
Mobile Systems as of 11 June 1962, by Donald D. Buchanan and George W. Waiter, report
MIN-LOD-DH-9-62 (Huntsville, AL, 11 June 1962), pp. 5-8; Buchanan interview, 7 Nov. 1972;
Waiter interview, 7 Nov. 1972.
- 24. MSFC, Transporter for Nova Track Design and
Stresses, by William H. Griffith, report NASA-MFSC-LOD-D; MSFC, Appraisal of Transfer
Modes, p.5; MSFC, Saturn Mobile (Rail) Concept: An Examination of Rail Transfer Systems
for a Launcher/Transporter, by George W. Waiter, report MIN-LOD-DH-3-62 (Huntsville, AL,
3 Apr. 1962).
- 25. Maurice H. Connell & Assoc., Inc., Saturn C-5
Launch Facilities Complex 39: Study of Rail Systems for Vertical Transporter/Launcher Concept
(Huntsville, AL: MSFC, May 1962), p. 7.
- 26. MSFC, Appraisal of Transfer Modes, pp. 9-11;
MSFC Weekly Notes, Debus to von Braun, 28 May 1962; Buchanan, memo for record, "Analysis by
H. Pierce, 15 May 1962,"Buchanan's private papers.
- 27. LOD Weekly Notes, Zeiler, 15 Feb. 1962; Poppel, Zeiler,
Buchanan, and Duren made up the team.
- 28. Donald Buchanan, memo for record, "Launcher/Transporter
Crawler Version," 23 Mar. 1962; Buchanan interview, 28 Nov. 1972; Duren interview,29 Mar.1972;
MSFC, Appraisal of Transfer Modes, pp. 5, 8-9.
- 29. LOD Weekly Notes, Poppel, 16 May 1962; MSFC,
Appraisal of Transfer Modes, p. 9; Buchanan, memo for record, "TDY at Bucyrus-Erie, South
Milwaukee, Wisconsin," 16 Apr. 1962, Buchanan's private papers; Buchanan interview, 28 Nov. 1972;
Buchanan, memo for record, "Analysis by H. Pierce, 15 May 1962," Buchanan's papers.
- 30. Army Corps of Engineers, Jacksonville Off., "Summary of
Opinions Developed by the Jacksonville District Engineering Staff on Mobile Launch Concepts for
the Advanced Saturn C-5 Vehicle," June 1962, in Buchanan's papers.
- 31. MSFC, Appraisal of Transfer Modes, p. 11.
- 32. William T. Clearman, Jr., memo, "Launch Operations
Directorate Complex 39 Review," 18 Sept. 1962; E. M. Briel's notes, 12-13 June 1962.
- 33. Biographies, in KSC Archives; Claybourne interview;
Clearman interview, 5 Jan. 1973.
- 34. Launch Operations Center (hereafter cited as LOC),
"Summary of Conference with Members of Manned Space Flight Sub-Committee of House
Committee on Science and Astronautics at the NASA Launch Operations Center," 23 Mar. 1962, p.
27.
- 35. Martin, Saturn C-3 Study, 3: 46-52.
- 36. Clearman, "Complex 39 Staff Meeting," 12 Mar. 1962; Deese
to Moser et al., "Preliminary Concepts, Vertical Building," 6 Mar. 1962; Brown Engineering Co., Inc.,
An Evaluation of an Enclosed Concept for a C-5 Vertical Assembly Building (VAB)," 2 Apr.
1962, pp. 7-8; Brown Engineering Co., Inc., An Evaluation of an Open Concept for a C-5 Vertical
Assembly Building, 2 Apr. 1962, pp. 9-10.
- 37. Briel's notes, 12-13 June 1962; Brown Engineering Co.,
"Evolution of the Saturn C-5 Mobile System Vertical Assembly Building," a mimeographed report
prepared by E. M. Briel, 7 Sept. 1962.
- 38. LOC, "Minutes of the Saturn C-5 Launch Operations
Working Group Meeting, 18-19 July 1962," 8 Aug. 1962, pp. 2-6.
- 39. Briel's notes, 31 July 1962; DDJ, 15 Aug. 1962.
- 40. URSAM, "VAB-LC39: A Report of Meeting with
Representatives of LOC, Corps of Engineers and Component Contractors" (Cape Canaveral, FL, 28
Aug. 1962), app. A.
- 41. Isom G. Rigell, memo, "LC-39 Networks," 4 Sept. 1962;
Norman Gerstenzang, memo for record, 5 Sept. 1962; unsigned memo, "Information Required by
LO-FEE for LC-39, VAB Criteria," 6 Sept. 1962.
- 42. Joe J. Koperski, Chief, Engineering Div., Corps of
Engineers, to R. P . Dodd, "Back-to-Back vs. In-Line Configuration, Comparisons and Conclusions
- Launch Complex 39-Vertical Assembly Building," 21 Sept. 1962.
- 43. Deese interview, 4 Oct. 1973.
- 44. NASA, "A Report on Launch Facility Concepts for
Advanced Saturn Launch Facilities," by Marvin Redfield, John Hammersmith, and Jay A. Salmonson,
13 Feb. 1962.
- 45. House, Hearings: 1963 NASA Authorization, p.
941.
- 46. LOC, "Summary of Conference with Members of Manned
Space Flight," 23 Mar. 1962, pp. 13-34.
- 47. Ibid., pp. 21, 30. In an interview with James Frangie on 13
Aug. 1969, Col. Bidgood pointed out that LC-39 provided launch rate flexibility but had limitations
in its ability to accommodate different vehicles.
- 48. NASA, "Minutes of the Management Council Office of
Manned Space Flight," 29 May 1962.
- 49. Ibid., 22 June 1962; DDJ, 15 June 1962.
- 50. Logsdon, "NASA's Implementation," pp. 56-60.
- 51. The mode selection story continued several more months
as NASA had to defend the choice against strong criticism from the President's Science Advisory
Committee. For a lengthier treatment of one of Apollo's most interesting episodes, see Logsdon,
"NASA's Implementation."
- 52. "LOD Weekly Notes," Sendler, 5, 19 July 1962, Bidgood,
5 July, 2, 23 Aug. 1962; DDJ, 15, 21 Aug. 1962.
- 53. Poppel to Bidgood, "Preliminary Design for a Mobile
Arming Tower for Launch Complex 39," 10 Aug. 1962.
- 54. LOD, "Minutes of the Saturn C-5 Launch Operations
Working Group Meeting, 18-19 July 1962," 8 Aug. 1962, pp. 1-5 and app. 9.
- 55. Redfield interview.